Renewable planning › Battery storage › Teignbridge
Battery storage planning in Teignbridge
Teignbridge has decided 1 battery storage scheme and approved 0% of them, taking a median of 1.8 months to decide. 5 applications still awaiting a decision.
⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Teignbridge compares
Against the 137 UK authorities with 5+ battery storage decisions, Teignbridge sits in the 0th percentile for approval rate (92 points below the England average) and the 97th percentile for speed.
Every recorded scheme (7)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Newton Road & Pottery Road, Bovey Tracey - Micro Energy Storage AMP Clean Energy · 26/00321/FUL | 0.2 | Application Submitted | 2026-03-04 |
Totnes Road, Ipplepen - Micro Energy Storage Facility Aggregated Micro Power Holdings Plc · 25/00815/FUL · 1.8 mo to decide | 0.2 | Application Refused | 2025-07-07 |
Old Teignmouth Road - Micro Energy Storage Facility AMP Energy Services Limited · 24/01127/FUL | 0.2 | Application Withdrawn | 2024-09-17 |
Totnes Road, Ipplepen - Micro Energy Storage Facility Aggregated Micro Power Holdings Plc · 24/01125/FUL | 0.2 | Revised | 2024-08-29 |
Kingskerswell - Micro Energy Storage Facility AMP Clean Energy · 24/01126/FUL | 0.2 | Application Submitted | 2024-07-05 |
Newton Road, Bovey Tracey - Micro Energy Storage Facility AMP Energy Services Limited · 24/01124/FUL | 0.2 | Application Submitted | 2024-07-05 |
Langdon Hospital, Langdon - Battery Energy Storage System Devon Partnership NHS Trust · 25/01244/MAJ | — | Application Submitted | — |
Does Teignbridge approve battery storage schemes?
Yes — of the 1 battery storage schemes Teignbridge has decided, 0% were approved (0 granted, 1 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a battery storage scheme application take in Teignbridge?
The median time from application to decision is 1.8 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has Teignbridge consented?
0 MW has been consented across 0 approved schemes. A further 5 applications awaits a decision.
Other technologies in Teignbridge
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.