Battery storage planning in Tandridge

Tandridge has decided 3 battery storage schemes and approved 100% of them, taking a median of 2.1 months to decide. Consented capacity: 12 MW.

100%
Approved
3 granted · 0 refused
2.1 mo
Median decision
UK 6 mo
12 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Tandridge compares

Against the 137 UK authorities with 5+ battery storage decisions, Tandridge sits in the 73rd percentile for approval rate (8 points above the England average) and the 94th percentile for speed.

Every recorded scheme (3)

SchemeMWStatusDecided
Verge At Succombs Hill, By Wapses Lodge Roundabout - Battery Storage
AMP Clean Energy · 2024/849 · 2.1 mo to decide
0.2Awaiting Construction2024-11-06
Godstone Fire Station, Fosterdown - Micro Energy Storage Facility
AMP Clean Energy · 2024/848 · 1.6 mo to decide
0.2Awaiting Construction2024-10-10
Caterham Bypass - Battery Energy Storage
Ylem Energy Limited · 2023/1430 · 9.3 mo to decide
12Awaiting Construction2024-09-05

Does Tandridge approve battery storage schemes?

Yes — of the 3 battery storage schemes Tandridge has decided, 100% were approved (3 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Tandridge?

The median time from application to decision is 2.1 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Tandridge consented?

12 MW has been consented across 3 approved schemes. There are no applications currently awaiting a decision.

Other technologies in Tandridge

Solar in TandridgeOnshore wind in Tandridge

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.