Renewable planning › Battery storage › Stockton-on-Tees
Battery storage planning in Stockton-on-Tees
Stockton-on-Tees has decided 8 battery storage schemes and approved 100% of them, taking a median of 5.4 months to decide. Consented capacity: 147 MW. 1 application still awaiting a decision.
How Stockton-on-Tees compares
Against the 137 UK authorities with 5+ battery storage decisions, Stockton-on-Tees sits in the 73rd percentile for approval rate (8 points above the England average) and the 55th percentile for speed.
Decisions by year
Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (9)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Cowpen Bewley, Seal Sands Link Road - Battery Energy Storage Harmony Energy Limited · 24/2141/FUL | 200 | Application Submitted | 2025-01-22 |
Belasis Avenue - Battery Storage Story Construction Limited · 23/1634/FUL · 7.7 mo to decide | 75 | Awaiting Construction | 2024-04-19 |
Norton Substation, Letch Lane - Battery Storage Facility AL Boum Photo Limited · 23/1945/FUL · 3 mo to decide | — | Awaiting Construction | 2024-01-19 |
The Carrs - Meadow Farm Energy storage facility BayWa r.e. · 23/0752/FUL · 4.9 mo to decide | 57 | Awaiting Construction | 2023-09-21 |
California Farm - Solar Farm & Battery Storage Infinis Solar Developments Limited · 22/1511/FUL · 8.5 mo to decide | — | Awaiting Construction | 2023-03-15 |
Gately Moor Reservoir, Redmarshall - Solar Farm & Battery Storage Canadian Solar & Novergy · 22/1499/FUL · 4.8 mo to decide | — | Awaiting Construction | 2022-11-23 |
Gately Moor Reservoir, Redmarshall - Solar Farm & Battery Storage Canadian Solar & Novergy · 22/00727/FUL · 3.8 mo to decide | — | Awaiting Construction | 2022-11-10 |
Bowesfield Flexible Energy Park Banks Group · 20/2721/FUL · 9.3 mo to decide | 8 | Awaiting Construction | 2021-10-15 |
The Brick Bank Levington Developments · 18/1521/FUL · 5.9 mo to decide | 7 | Planning Permission Expired | 2019-01-08 |
Does Stockton-on-Tees approve battery storage schemes?
Yes — of the 8 battery storage schemes Stockton-on-Tees has decided, 100% were approved (8 granted, 0 refused). The UK-wide rate for battery storage is 92%.
How long does a battery storage scheme application take in Stockton-on-Tees?
The median time from application to decision is 5.4 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has Stockton-on-Tees consented?
147 MW has been consented across 8 approved schemes. A further 1 application awaits a decision.
Other technologies in Stockton-on-Tees
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.