Battery storage planning in St. Helens

St. Helens has decided 3 battery storage schemes and approved 100% of them, taking a median of 2.5 months to decide. Consented capacity: 61 MW. 1 application still awaiting a decision.

100%
Approved
3 granted · 0 refused
2.5 mo
Median decision
UK 6 mo
61 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How St. Helens compares

Against the 137 UK authorities with 5+ battery storage decisions, St. Helens sits in the 73rd percentile for approval rate (8 points above the England average) and the 93rd percentile for speed.

Every recorded scheme (5)

SchemeMWStatusDecided
Holiday Moss Landfill Site, Reeds Brow - Battery Storage
Biffa Waste Services Limited · P/2022/0627/FUL · 2.4 mo to decide
3Awaiting Construction2022-11-17
Biffa Electricity Generating Compound, Burtonhead Road - Battery Storage
Biffa Waste Services Limited · P/2022/0557/FUL� · 2.5 mo to decide
1Awaiting Construction2022-10-18
Sutton Manor - Battery Storage Facility
Sizing John Limited · P/2022/0392/FUL · 3.4 mo to decide
57Awaiting Construction2022-09-16
National Grids Rainhill Substation Battery storage facility
Sizing John Limited · P/2021/0094/FUL
57Revised2021-02-02
Burtonhead Road
Tiger Energy · P/2017/0822/FUL
30Abandoned2017-10-03

Does St. Helens approve battery storage schemes?

Yes — of the 3 battery storage schemes St. Helens has decided, 100% were approved (3 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in St. Helens?

The median time from application to decision is 2.5 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has St. Helens consented?

61 MW has been consented across 3 approved schemes. A further 1 application awaits a decision.

Other technologies in St. Helens

Solar in St. HelensOnshore wind in St. Helens

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.