Novarly ParcelRenewable planning

Renewable planning Battery storageSouth Cambridgeshire

Battery storage planning in South Cambridgeshire

South Cambridgeshire has decided 3 battery storage schemes and approved 100% of them, taking a median of 3.9 months to decide. Consented capacity: 317 MW. 3 applications still awaiting a decision.

100%
Approved
3 granted · 0 refused
3.9 mo
Median decision
UK 6 mo
317 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How South Cambridgeshire compares

Against the 137 UK authorities with 5+ battery storage decisions, South Cambridgeshire sits in the 73rd percentile for approval rate (8 points above the England average) and the 74th percentile for speed.

Decisions by year

35Approved — 1 (2022)122Approved — 1 (2023)123Approved — 1 (2024)124
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (6)

SchemeMWStatusDecided
River Mel Solar Farm & Battery Storage System
Quintas Cleantech · 25/02739/FUL
25Application Submitted2025-07-23
Falcon Park, Wilsons Road - Solar Farm & Battery Energy Storage
Regener8 Power Limited · 25/02539/FUL
20Application Submitted2025-06-27
Low Fen, Drove Way - Energy Storage System
South Cambridgeshire District Council · 25/01014/FUL
Application Submitted2025-03-14
Pumping Station, School Lane - Micro Energy Storage
AMP Clean Energy · 24/02976/FUL · 1.8 mo to decide
0.2Awaiting Construction2024-10-07
Highfield Farm, Royston Road - Solar Farm & Battery Storage
Grupotec Solar 3 UK Limited · 23/01317/FUL · 3.9 mo to decide
4.5Awaiting Construction2023-08-03
Stargoose Farm - Battery Storage
Solarcentury Limited / Statkraft Uk Limited · 21/02173/FUL · 11.1 mo to decide
312Awaiting Construction2022-04-14

Does South Cambridgeshire approve battery storage schemes?

Yes — of the 3 battery storage schemes South Cambridgeshire has decided, 100% were approved (3 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in South Cambridgeshire?

The median time from application to decision is 3.9 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has South Cambridgeshire consented?

317 MW has been consented across 3 approved schemes. A further 3 applications awaits a decision.

Other technologies in South Cambridgeshire

Solar in South CambridgeshireOnshore wind in South Cambridgeshire

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.