Battery storage planning in Sevenoaks

Sevenoaks has decided 4 battery storage schemes and approved 75% of them, taking a median of 4.3 months to decide. Consented capacity: 8 MW. 1 application still awaiting a decision.

75%
Approved
3 granted · 1 refused
4.3 mo
Median decision
UK 6 mo
8 MW
Consented
across approved schemes
1
Appeals
1 allowed on appeal

⚠️ Small caseload (4 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Sevenoaks compares

Against the 137 UK authorities with 5+ battery storage decisions, Sevenoaks sits in the 7th percentile for approval rate (17 points below the England average) and the 71st percentile for speed.

Decisions by year

35Approved — 1 (2018)118Approved — 1 (2023)123Approved — 1 (2025)125Refused — 1 (2026)126
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (5)

SchemeMWStatusDecided
Turners Gardens, Weald Road - Battery Storage
AMP Clean Energy · 25/03470/FUL · 1.8 mo to decide
0.2Application Refused2026-02-02
Chimmens Solar Farm
RES Limited · 23/03181/FUL · 19.1 mo to decide
Awaiting Construction2025-07-23
Idleigh Court Road, New Ash Green - Solar Array
Evolution Power · 24/03422/FUL
15Application Submitted2025-01-27
Commonwork Organic Farms Limited, Bore Place - Battery Storage
Charles Holt Consultancy · 23/02415/FUL · 1.8 mo to decide
Awaiting Construction2023-11-03
Gaywood Farm
AMDC Energy / Balanced Grid Solutions · 17/02668/FUL · 6.8 mo to decide
7.5Planning Permission Expired2018-03-12

Does Sevenoaks approve battery storage schemes?

Yes — of the 4 battery storage schemes Sevenoaks has decided, 75% were approved (3 granted, 1 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Sevenoaks?

The median time from application to decision is 4.3 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Sevenoaks consented?

8 MW has been consented across 3 approved schemes. A further 1 application awaits a decision.

Other technologies in Sevenoaks

Solar in SevenoaksOnshore wind in Sevenoaks

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com

Screen a specific site here · All authorities · UK property report