Novarly ParcelRenewable planning

Renewable planning Battery storageRother

Battery storage planning in Rother

Rother has decided 2 battery storage schemes and approved 100% of them, taking a median of 7.2 months to decide. Consented capacity: 240 MW. 2 applications still awaiting a decision.

100%
Approved
2 granted · 0 refused
7.2 mo
Median decision
UK 6 mo
240 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (2 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Rother compares

Against the 137 UK authorities with 5+ battery storage decisions, Rother sits in the 73rd percentile for approval rate (8 points above the England average) and the 32nd percentile for speed.

Decisions by year

35Approved — 1 (2021)121Approved — 1 (2025)125
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (4)

SchemeMWStatusDecided
Eastlands Farm, Catsfield - Catsfield Battery Energy Storage Facility
Masdar Arlington Energy · RR/2024/1535/P · 10.2 mo to decide
240Awaiting Construction2025-08-04
Catsfield Christmas Tree Farm, The Stream - Battery Energy Storage System
Elgin Energy Esco Limited · RR/2025/1284/P
99.9Application Submitted2025-07-28
Kilnwood Farm, Lunsford Cross - Energy Storage
Statkraft UK Limited · RR/2021/2341/P
Application Submitted2021-09-23
Arlington Energy Battery Storage
Arlington Energy Limited · RR/2020/1817/P · 4.1 mo to decide
Under Construction2021-02-09

Does Rother approve battery storage schemes?

Yes — of the 2 battery storage schemes Rother has decided, 100% were approved (2 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Rother?

The median time from application to decision is 7.2 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Rother consented?

240 MW has been consented across 2 approved schemes. A further 2 applications awaits a decision.

Other technologies in Rother

Solar in RotherOnshore wind in Rother

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com