Renewable planning › Battery storage › Powys
Battery storage planning in Powys
Powys has decided 3 battery storage schemes and approved 100% of them, taking a median of 2.4 months to decide. Consented capacity: 1 MW.
⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Powys compares
Against the 137 UK authorities with 5+ battery storage decisions, Powys sits in the 73rd percentile for approval rate (8 points above the England average) and the 93rd percentile for speed.
Every recorded scheme (4)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Unit B, Mochdre Industrial Estate - Micro Energy Storage Facility Aggregated Micro Power Holdings Plc · 24/0218/FUL · 2.5 mo to decide | 0.2 | Awaiting Construction | 2024-05-15 |
Dyffryn Industrial Estate, Pool Road - Energy Storage Facility AMP Energy Services Limited · 24/0161/FUL · 2.3 mo to decide | 0.2 | Awaiting Construction | 2024-04-25 |
Bryn Posteg Landfill Site - Solar Array & Battery Storage Potters Waste Management · 22/0885/FUL | — | Abandoned | 2022-06-24 |
Cefn y Maes Community Renewable Energy Park Cefn y Maes Community / REG Power Management · P/2017/0255 | 0.5 | Planning Permission Expired | 2017-03-10 |
Does Powys approve battery storage schemes?
Yes — of the 3 battery storage schemes Powys has decided, 100% were approved (3 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a battery storage scheme application take in Powys?
The median time from application to decision is 2.4 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has Powys consented?
1 MW has been consented across 3 approved schemes. There are no applications currently awaiting a decision.
Other technologies in Powys
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.
Novarly Parcel · official public data, read properly · parcel.novarly.com