Battery storage planning in Moray

Moray has decided 5 battery storage schemes and approved 100% of them, taking a median of 6.2 months to decide. Consented capacity: 153 MW. 1 application still awaiting a decision.

100%
Approved
5 granted · 0 refused
6.2 mo
Median decision
UK 6 mo
153 MW
Consented
across approved schemes
1
Appeals
1 allowed on appeal

⚠️ Small caseload (5 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Moray compares

Against the 137 UK authorities with 5+ battery storage decisions, Moray sits in the 73rd percentile for approval rate (8 points above the England average) and the 43rd percentile for speed.

Decisions by year

35Approved — 1 (2021)121Approved — 1 (2022)122Approved — 3 (2023)323
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (6)

SchemeMWStatusDecided
Loanhead Farm - Battery Energy Storage System
OPDE UK Limted · 25/00469/APP
49.9Application Submitted2025-05-26
Bishopmill - Battery Energy Storage
Green Power Consultants · 23/00994/APP · 6.2 mo to decide
30Awaiting Construction2023-12-21
Electricity Substation, Westerton Road - Battery Storage
Keith Renewables Limited · 22/01488/APP · 5 mo to decide
49.9Awaiting Construction2023-03-15
Speyslaw Farm - Battery Storage
Elgin Energy EsCo · 21/01805/APP · 14 mo to decide
19.9Awaiting Construction2023-02-09
Drum Farm - Battery Energy Storage System
Field Energy · 22/00715/APP · 5.5 mo to decide
49.9Awaiting Construction2022-10-27
Garbet Windfarm - Wind Farm & Storage facility
Energiekontor UK Limited · 21/00020/EIA · 10.5 mo to decide
3Under Construction2021-11-26

Does Moray approve battery storage schemes?

Yes — of the 5 battery storage schemes Moray has decided, 100% were approved (5 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Moray?

The median time from application to decision is 6.2 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Moray consented?

153 MW has been consented across 5 approved schemes. A further 1 application awaits a decision.

Other technologies in Moray

Solar in MorayOnshore wind in Moray

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.