Renewable planning › Battery storage › Glasgow City
Battery storage planning in Glasgow City
Glasgow City has decided 2 battery storage schemes and approved 100% of them, taking a median of 6.4 months to decide. Consented capacity: 74 MW. 2 applications still awaiting a decision.
⚠️ Small caseload (2 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Glasgow City compares
Against the 137 UK authorities with 5+ battery storage decisions, Glasgow City sits in the 73rd percentile for approval rate (8 points above the England average) and the 40th percentile for speed.
Decisions by year
Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (5)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Kennishead Road - Battery Energy Storage Starlight Energy · 25/00468/FUL | 40 | Application Withdrawn | 2026-01-21 |
Parkhouse Road - Battery Energy Storage GPC 1184 Limited · 24/00342/FUL · 17.1 mo to decide | 24 | Awaiting Construction | 2025-08-08 |
Govan Battery Energy Storage System Vital Energi Utilities Limited · 24/03094/FUL | 49.9 | Application Submitted | 2025-02-11 |
Broomloan Road - Battery Energy Storage Lifetime Property Limited · 24/00714/FUL · 6.4 mo to decide | 49.9 | Awaiting Construction | 2024-10-04 |
Broomloan Road - Battery Energy Storage Lifetime Property Limited · 22/00637/FUL · 3.4 mo to decide | 49.9 | Revised | 2022-06-28 |
Does Glasgow City approve battery storage schemes?
Yes — of the 2 battery storage schemes Glasgow City has decided, 100% were approved (2 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a battery storage scheme application take in Glasgow City?
The median time from application to decision is 6.4 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has Glasgow City consented?
74 MW has been consented across 2 approved schemes. A further 2 applications awaits a decision.
Other technologies in Glasgow City
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.