Battery storage planning in Charnwood

Charnwood has decided 4 battery storage schemes and approved 100% of them, taking a median of 13.2 months to decide.

100%
Approved
4 granted · 0 refused
13.2 mo
Median decision
UK 6 mo
0 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (4 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Charnwood compares

Against the 137 UK authorities with 5+ battery storage decisions, Charnwood sits in the 73rd percentile for approval rate (8 points above the England average) and the 5th percentile for speed.

Decisions by year

35Approved — 1 (2019)119Approved — 1 (2023)123Approved — 2 (2024)224
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (4)

SchemeMWStatusDecided
Derby Road, Lond Whatton - Battery Storage
Aura Power BESS Limited · P/23/0037/2 · 16.8 mo to decide
Awaiting Construction2024-06-14
Long Whatton - Solar Farm
Endurance Energy Oakley Limited · P/23/0379/2 · 11.2 mo to decide
Awaiting Construction2024-02-26
Nottingham Road - Battery Storage
NextPower SPV 9 Limited · P/21/2160/2 · 15.2 mo to decide
Awaiting Construction2023-03-30
Nottingham Road
Suncredit · P/18/2057/2 · 2.7 mo to decide
Planning Permission Expired2019-03-01

Does Charnwood approve battery storage schemes?

Yes — of the 4 battery storage schemes Charnwood has decided, 100% were approved (4 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Charnwood?

The median time from application to decision is 13.2 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Charnwood consented?

0 MW has been consented across 4 approved schemes. There are no applications currently awaiting a decision.

Other technologies in Charnwood

Solar in CharnwoodOnshore wind in Charnwood

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.