Battery storage planning in Cardiff

Cardiff has decided 4 battery storage schemes and approved 100% of them, taking a median of 4.1 months to decide. Consented capacity: 1,094 MW. 5 applications still awaiting a decision.

100%
Approved
4 granted · 0 refused
4.1 mo
Median decision
UK 6 mo
1,094 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (4 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Cardiff compares

Against the 137 UK authorities with 5+ battery storage decisions, Cardiff sits in the 73rd percentile for approval rate (8 points above the England average) and the 72nd percentile for speed.

Decisions by year

35Approved — 2 (2024)224Approved — 1 (2025)125
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (9)

SchemeMWStatusDecided
The Wales Millennium Centre, Bute Place - Battery Energy Storage
Newton Energi Limited · 26/00421/FUL
0.5Application Submitted2026-03-04
Gabalfa Interchange - Micro Energy Storage
AMP Clean Energy · 26/00147/FUL
0.2Application Submitted2026-01-26
Llanedeyrn Drive - Micro Energy Storage Project
AMP Clean Energy · 26/00087/FUL
0.2Application Submitted2026-01-19
Rover Way, Splott - Energy Park & Data Centre
Latos Cardiff Limited · 24/00624/FUL · 12.8 mo to decide
1000Awaiting Construction2025-04-15
Panasonic Manufacturing, Pentwyn - BESS
Panasonic Manufacturing UK · 24/00924/FUL · 2.2 mo to decide
1.08Under Construction2024-06-27
Ipswich Road, Cardiff - Battery Storage
Green Frog Power 214 Limited · 23/02817/FUL · 4.1 mo to decide
93Awaiting Construction2024-04-08
Tramshed, Pendyris Street - Solar Panels & Battery Storage
Tewdric Energy · 22/02796/FUL
Application Submitted2022-11-24
Ipswich Road, Cardiff - Battery Storage
Green Frog Power 214 Limited · 21/02369/MNR
50Revised2021-10-05
Flat Holm Microgrid Project
Wind & Sun
Operational

Does Cardiff approve battery storage schemes?

Yes — of the 4 battery storage schemes Cardiff has decided, 100% were approved (4 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Cardiff?

The median time from application to decision is 4.1 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Cardiff consented?

1,094 MW has been consented across 4 approved schemes. A further 5 applications awaits a decision.

Other technologies in Cardiff

Solar in CardiffOnshore wind in Cardiff

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.