Battery storage planning in Bromsgrove

Bromsgrove has decided 1 battery storage scheme and approved 100% of them, taking a median of 12.6 months to decide. Consented capacity: 70 MW.

100%
Approved
1 granted · 0 refused
12.6 mo
Median decision
UK 6 mo
70 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Bromsgrove compares

Against the 137 UK authorities with 5+ battery storage decisions, Bromsgrove sits in the 73rd percentile for approval rate (8 points above the England average) and the 7th percentile for speed.

Every recorded scheme (1)

SchemeMWStatusDecided
Illey Lane - Battery Energy Storage
Grenergy Renewables UK Limited · 24/00960/FUL · 12.6 mo to decide
70Awaiting Construction2025-10-14

Does Bromsgrove approve battery storage schemes?

Yes — of the 1 battery storage schemes Bromsgrove has decided, 100% were approved (1 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Bromsgrove?

The median time from application to decision is 12.6 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Bromsgrove consented?

70 MW has been consented across 1 approved scheme. There are no applications currently awaiting a decision.

Other technologies in Bromsgrove

Solar in BromsgroveOnshore wind in Bromsgrove

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.