Novarly ParcelRenewable planning

Renewable planning Battery storageBrentwood

Battery storage planning in Brentwood

Brentwood has decided 3 battery storage schemes and approved 100% of them, taking a median of 5.4 months to decide. Consented capacity: 110 MW.

100%
Approved
3 granted · 0 refused
5.4 mo
Median decision
UK 6 mo
110 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Brentwood compares

Against the 137 UK authorities with 5+ battery storage decisions, Brentwood sits in the 73rd percentile for approval rate (8 points above the England average) and the 55th percentile for speed.

Decisions by year

35Approved — 1 (2017)117Approved — 2 (2021)221
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (3)

SchemeMWStatusDecided
Crouch Solar Farm
Low Carbon Storage · 21/00834/FUL · 7.6 mo to decide
49.9Operational2021-12-23
Brentwood nergy Storage System
Anesco Limited · 20/01800/FUL · 5.4 mo to decide
49.9Awaiting Construction2021-05-21
Hutton Battery Storage (Lower Road)
Gore Street Capital / Flexitricity Limited · 17/01477/FUL · 2.5 mo to decide
10Operational2017-12-15

Does Brentwood approve battery storage schemes?

Yes — of the 3 battery storage schemes Brentwood has decided, 100% were approved (3 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Brentwood?

The median time from application to decision is 5.4 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Brentwood consented?

110 MW has been consented across 3 approved schemes. There are no applications currently awaiting a decision.

Other technologies in Brentwood

Solar in BrentwoodOnshore wind in Brentwood

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com

Screen a specific site here · All authorities · UK property report