Novarly ParcelRenewable planning

Renewable planning Battery storageBlackpool

Battery storage planning in Blackpool

Blackpool has decided 1 battery storage scheme and approved 100% of them, taking a median of 3.6 months to decide. Consented capacity: 25 MW.

100%
Approved
1 granted · 0 refused
3.6 mo
Median decision
UK 6 mo
25 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Blackpool compares

Against the 137 UK authorities with 5+ battery storage decisions, Blackpool sits in the 73rd percentile for approval rate (8 points above the England average) and the 77th percentile for speed.

Every recorded scheme (1)

SchemeMWStatusDecided
Bristol Avenue - Battery Energy Storage Facility
Henco International Limited · 21/0246 · 3.6 mo to decide
25Awaiting Construction2021-05-11

Does Blackpool approve battery storage schemes?

Yes — of the 1 battery storage schemes Blackpool has decided, 100% were approved (1 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Blackpool?

The median time from application to decision is 3.6 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Blackpool consented?

25 MW has been consented across 1 approved scheme. There are no applications currently awaiting a decision.

Other technologies in Blackpool

Solar in BlackpoolOnshore wind in Blackpool

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com

Screen a specific site here · All authorities · UK property report