Battery storage planning in Armagh City, Banbridge and Craigavon

Armagh City, Banbridge and Craigavon has decided 1 battery storage scheme and approved 100% of them. Consented capacity: 50 MW.

100%
Approved
1 granted · 0 refused
Median decision
UK 6 mo
50 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Armagh City, Banbridge and Craigavon compares

Against the 137 UK authorities with 5+ battery storage decisions, Armagh City, Banbridge and Craigavon sits in the 73rd percentile for approval rate (8 points above the England average).

Every recorded scheme (1)

SchemeMWStatusDecided
Portadown Road
Low Carbon Storage Ireland · LA08/2018/0851/F
50Under Construction2018-06-18

Does Armagh City, Banbridge and Craigavon approve battery storage schemes?

Yes — of the 1 battery storage schemes Armagh City, Banbridge and Craigavon has decided, 100% were approved (1 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Armagh City, Banbridge and Craigavon?

There are not enough dated decisions in Armagh City, Banbridge and Craigavon to compute a median decision time for battery storage schemes.

How much battery storage capacity has Armagh City, Banbridge and Craigavon consented?

50 MW has been consented across 1 approved scheme. There are no applications currently awaiting a decision.

Other technologies in Armagh City, Banbridge and Craigavon

Solar in Armagh City, Banbridge and CraigavonOnshore wind in Armagh City, Banbridge and Craigavon

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com

Screen a specific site here · All authorities · UK property report