Novarly ParcelRenewable sites

Renewable sitesDouglas West Wind Farm (extension)

Douglas West Wind Farm (extension)

Douglas West Wind Farm (extension) is under construction in Scottish Government (S36) with a recorded capacity of 20 MW.

20 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
ScottishPower Renewables (UK) Limited
Scottish Government (S36)
Authority
Scotland

Planning and build timeline

Application submitted2019-04-12
Permission granted2021-11-18
31 months after submission
Operationalnot recorded

Scottish Government (S36)’s record on battery storage

Scottish Government (S36) has decided 108 battery storage schemes and approved 94%, taking a median of 17.3 months. See every battery storage scheme decision in Scottish Government (S36)

Other built sites within 15 km

SiteMWDistance
Douglas West Wind Farm (extension)
Wind Onshore · Under Construction
780 km
Douglas West and Dalquhandy Renewable Energy Project
Wind Onshore · Operational
450 km
Cumberhead West Wind Farm
Wind Onshore · Under Construction
1261.3 km
Cumberhead West Wind Farm
Battery · Under Construction
401.3 km
Nutberry Wind Farm
Wind Onshore · Operational
152.4 km
Hagshaw Hill Wind Farm Extension
Wind Onshore · Operational
263 km
Hazelside farm
Wind Onshore · Under Construction
1.63.3 km
Coalburn Energy - Battery Storage
Battery · Under Construction
5003.7 km

How big is Douglas West Wind Farm (extension)?

Douglas West Wind Farm (extension) has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Douglas West Wind Farm (extension)?

REPD records the operator as ScottishPower Renewables (UK) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Douglas West Wind Farm (extension) approved and built?

The application was submitted on 2019-04-12. Permission was granted on 2021-11-18, 31 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9957.

Novarly Parcel · official public data, read properly · parcel.novarly.com