Novarly ParcelRenewable planning

Renewable planning Onshore windWest Lindsey

Onshore wind planning in West Lindsey

West Lindsey has decided 2 onshore wind schemes and approved 0% of them, taking a median of 9.7 months to decide. 1 application still awaiting a decision.

0%
Approved
0 granted · 2 refused
9.7 mo
Median decision
UK 11.5 mo
0 MW
Consented
53 MW refused
2
Appeals
0 allowed on appeal

⚠️ Small caseload (2 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How West Lindsey compares

Against the 75 UK authorities with 5+ onshore wind decisions, West Lindsey sits in the 0th percentile for approval rate (68 points below the England average) and the 76th percentile for speed.

Every recorded scheme (7)

SchemeMWStatusDecided
Brown's Holt Wind Farm
Renewable Energy Systems (RES) · 132109
24Application Withdrawn2016-05-27
Hemswell Cliff Wind Farm
RWE Npower Renewables · 128940 · 5 mo to decide
25Appeal Refused2013-01-01
Welton Gathering Centre
Star Energy · M03/p/1291
2Application Withdrawn2011-06-29
Nettleham Oil Production Facility
Star Energy · M03/p/1292
1.3Application Withdrawn2011-06-29
Stainton Oil Production Facility
Star Energy · M03/p/1293
28Application Withdrawn2009-02-04
Laughton Wind Farm
Laughton Wind Farm · M06/P/0280 · 20.3 mo to decide
28Appeal Refused2007-11-29
Laughton Wind Farm
Your Energy · M03/P/1152 · 9.7 mo to decide
16Revised2004-08-25

Does West Lindsey approve onshore wind schemes?

Yes — of the 2 onshore wind schemes West Lindsey has decided, 0% were approved (0 granted, 2 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in West Lindsey?

The median time from application to decision is 9.7 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has West Lindsey consented?

0 MW has been consented across 0 approved schemes, with 53 MW refused. A further 1 application awaits a decision.

Other technologies in West Lindsey

Solar in West LindseyBattery storage in West Lindsey

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com