Onshore wind planning in West Lancashire

West Lancashire has decided 2 onshore wind schemes and approved 50% of them, taking a median of 11.8 months to decide. 1 application still awaiting a decision.

50%
Approved
1 granted · 1 refused
11.8 mo
Median decision
UK 11.5 mo
0 MW
Consented
42 MW refused
0
Appeals
no appeals recorded

⚠️ Small caseload (2 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How West Lancashire compares

Against the 75 UK authorities with 5+ onshore wind decisions, West Lancashire sits in the 20th percentile for approval rate (18 points below the England average) and the 59th percentile for speed.

Decisions by year

35Refused — 1 (2016)116Approved — 1 (2021)121
Approved Refused

Onshore wind decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (3)

SchemeMWStatusDecided
Barton House Farm, Pimbo Road - Wind Turbine
Green Energy Nationwide · 2024/1110/FUL
2.5Application Submitted2025-01-10
Deans Lane Wind Turbine
Eocycle Limited · 2020/0933/FUL · 12.6 mo to decide
Awaiting Construction2021-11-23
Lower Alt Wind Farm
Coriolis Energy / ESB · 2015/1055/FUL · 10.9 mo to decide
42Application Refused2016-11-11

Does West Lancashire approve onshore wind schemes?

Yes — of the 2 onshore wind schemes West Lancashire has decided, 50% were approved (1 granted, 1 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in West Lancashire?

The median time from application to decision is 11.8 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has West Lancashire consented?

0 MW has been consented across 1 approved scheme, with 42 MW refused. A further 1 application awaits a decision.

Other technologies in West Lancashire

Solar in West LancashireBattery storage in West Lancashire

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.