Onshore wind planning in South Hams

South Hams has decided 3 onshore wind schemes and approved 0% of them, taking a median of 2.7 months to decide.

0%
Approved
0 granted · 3 refused
2.7 mo
Median decision
UK 11.5 mo
0 MW
Consented
10 MW refused
1
Appeals
0 allowed on appeal

⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How South Hams compares

Against the 75 UK authorities with 5+ onshore wind decisions, South Hams sits in the 0th percentile for approval rate (68 points below the England average) and the 100th percentile for speed.

Every recorded scheme (6)

SchemeMWStatusDecided
Totnes Community Wind Farm
Totnes Renewable Energy Society · 23/1990/12/F · 6 mo to decide
4.6Application Refused2013-02-14
Beech Tree Farm
Cornwall Light and Power · 08_19/2525/07/F · 2.5 mo to decide
4Appeal Refused2008-02-14
Beech Tree Farm Wind Turbines
Npower Renewables · 819/2140/04/F
4.9Application Withdrawn2006-12-04
Stumpy Post
Windworks (National Wind Power) · 08/0175/03/F · 2.7 mo to decide
1.3Application Refused2003-05-28
Island Park Lodge
Windworks (National Wind Power) · 08/0180/02
1.3Application Withdrawn2002-05-24
Start Point Lighthouse - Supply and Installation of Wind Turbine
Northern Lighthouse Board
No Application Required

Does South Hams approve onshore wind schemes?

Yes — of the 3 onshore wind schemes South Hams has decided, 0% were approved (0 granted, 3 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in South Hams?

The median time from application to decision is 2.7 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has South Hams consented?

0 MW has been consented across 0 approved schemes, with 10 MW refused. There are no applications currently awaiting a decision.

Other technologies in South Hams

Solar in South HamsBattery storage in South Hams

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.