Novarly ParcelRenewable planning

Renewable planning Onshore windRugby

Onshore wind planning in Rugby

Rugby has decided 2 onshore wind schemes and approved 0% of them, taking a median of 4 months to decide.

0%
Approved
0 granted · 2 refused
4 mo
Median decision
UK 11.5 mo
0 MW
Consented
26 MW refused
1
Appeals
0 allowed on appeal

⚠️ Small caseload (2 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Rugby compares

Against the 75 UK authorities with 5+ onshore wind decisions, Rugby sits in the 0th percentile for approval rate (68 points below the England average) and the 97th percentile for speed.

Decisions by year

35Refused — 1 (2011)111Refused — 1 (2014)114
Approved Refused

Onshore wind decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (3)

SchemeMWStatusDecided
Swift Wind Farm
Renewable Energy Systems (RES) · R15/0908
8Application Withdrawn2016-03-14
Swift Wind Farm (Bransford Bridge)
Renewable Energy Systems (RES) · R12/2009 · 5 mo to decide
8Appeal Refused2014-04-23
Bransford Bridge
Scottish and Southern Energy (SSE) · R10/2303 · 3.1 mo to decide
18Application Refused2011-09-07

Does Rugby approve onshore wind schemes?

Yes — of the 2 onshore wind schemes Rugby has decided, 0% were approved (0 granted, 2 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Rugby?

The median time from application to decision is 4 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Rugby consented?

0 MW has been consented across 0 approved schemes, with 26 MW refused. There are no applications currently awaiting a decision.

Other technologies in Rugby

Solar in RugbyBattery storage in Rugby

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.