Novarly ParcelRenewable planning

Renewable planning Onshore windMilton Keynes

Onshore wind planning in Milton Keynes

Milton Keynes has decided 2 onshore wind schemes and approved 50% of them, taking a median of 15.4 months to decide. Consented capacity: 14 MW.

50%
Approved
1 granted · 1 refused
15.4 mo
Median decision
UK 11.5 mo
14 MW
Consented
15 MW refused
1
Appeals
0 allowed on appeal

⚠️ Small caseload (2 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Milton Keynes compares

Against the 75 UK authorities with 5+ onshore wind decisions, Milton Keynes sits in the 20th percentile for approval rate (18 points below the UK average) and the 41st percentile for speed.

Screening a site of your own?

RedlineUK · £39

Milton Keynes approves 50% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site£39
Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Every recorded scheme (4)

SchemeMWStatusDecided
Stoke Heights Wind Farm
Ecotricity · 11/01193/FULEIS
30Application Withdrawn2014-01-01
Nunn Wood
Npower Renewables · WP/2006/0474/FM
24Application Withdrawn2013-10-08
Orchard Way Wind Farm
Npower Renewables · 11/02028/FULEIS · 13.9 mo to decide
15Appeal Refused2012-11-13
Milton Keynes Wind Farm
Gravis Capital Management · 06/01349/FULEIS · 16.9 mo to decide
14Operational2008-01-14

Does Milton Keynes approve onshore wind schemes?

Yes — of the 2 onshore wind schemes Milton Keynes has decided, 50% were approved (1 granted, 1 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Milton Keynes?

The median time from application to decision is 15.4 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Milton Keynes consented?

14 MW has been consented across 1 approved scheme, with 15 MW refused. There are no applications currently awaiting a decision.

Other technologies in Milton Keynes

Solar in Milton KeynesBattery storage in Milton Keynes

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com