Novarly ParcelRenewable planning

Renewable planning Onshore windLeeds

Onshore wind planning in Leeds

Leeds has decided 1 onshore wind scheme and approved 100% of them, taking a median of 45.4 months to decide. Consented capacity: 10 MW.

100%
Approved
1 granted · 0 refused
45.4 mo
Median decision
UK 11.5 mo
10 MW
Consented
across approved schemes
1
Appeals
1 allowed on appeal

⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Leeds compares

Against the 75 UK authorities with 5+ onshore wind decisions, Leeds sits in the 98th percentile for approval rate (32 points above the UK average) and the 0th percentile for speed.

Screening a site of your own?

RedlineUK · £39

Leeds approves 100% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site£39
Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Every recorded scheme (1)

SchemeMWStatusDecided
Hook Moor
Banks Renewables · 08/01118/FU · 45.4 mo to decide
10.3Operational2011-12-09

Does Leeds approve onshore wind schemes?

Yes — of the 1 onshore wind schemes Leeds has decided, 100% were approved (1 granted, 0 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Leeds?

The median time from application to decision is 45.4 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Leeds consented?

10 MW has been consented across 1 approved scheme. There are no applications currently awaiting a decision.

Other technologies in Leeds

Solar in LeedsBattery storage in Leeds

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com