Renewable planning › Onshore wind › Hinckley and Bosworth
Onshore wind planning in Hinckley and Bosworth
Hinckley and Bosworth has decided 1 onshore wind scheme and approved 100% of them, taking a median of 3.4 months to decide. Consented capacity: 2 MW. 1 application still awaiting a decision.
⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Hinckley and Bosworth compares
Against the 75 UK authorities with 5+ onshore wind decisions, Hinckley and Bosworth sits in the 98th percentile for approval rate (32 points above the England average) and the 99th percentile for speed.
Every recorded scheme (3)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Park House Farm, Leicester Lane - Wind Turbines Private Developer · 25/00940/FUL | 0.85 | Application Submitted | 2025-10-01 |
Halifax Farm Wentworth and Harper · 14/00532/FUL · 3.5 mo to decide | 1.6 | Operational | 2014-09-18 |
Stonehaven Wind Turbine Renewable Energy Systems (RES) · 14/00381/FUL · 3.3 mo to decide | 1.5 | Abandoned | 2014-07-23 |
Does Hinckley and Bosworth approve onshore wind schemes?
Yes — of the 1 onshore wind schemes Hinckley and Bosworth has decided, 100% were approved (1 granted, 0 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a onshore wind scheme application take in Hinckley and Bosworth?
The median time from application to decision is 3.4 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much onshore wind capacity has Hinckley and Bosworth consented?
2 MW has been consented across 1 approved scheme. A further 1 application awaits a decision.
Other technologies in Hinckley and Bosworth
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.