Renewable planning › Onshore wind › Flintshire
Onshore wind planning in Flintshire
Flintshire has decided 3 onshore wind schemes and approved 33% of them, taking a median of 9.2 months to decide. Consented capacity: 2 MW.
⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Flintshire compares
Against the 75 UK authorities with 5+ onshore wind decisions, Flintshire sits in the 6th percentile for approval rate (35 points below the England average) and the 80th percentile for speed.
Decisions by year
Onshore wind decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (3)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Kingspan Kingspan · 52922 · 4.8 mo to decide | 1.8 | Operational | 2015-04-14 |
Lygan Uchaf Farm Wind Turbine ReSence · 52344 · 9.2 mo to decide | 1.3 | Application Refused | 2015-04-13 |
Kingspan Factory Wind Turbines Wind Direct · 49300 · 22.6 mo to decide | 5 | Application Refused | 2013-11-07 |
Does Flintshire approve onshore wind schemes?
Yes — of the 3 onshore wind schemes Flintshire has decided, 33% were approved (1 granted, 2 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a onshore wind scheme application take in Flintshire?
The median time from application to decision is 9.2 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much onshore wind capacity has Flintshire consented?
2 MW has been consented across 1 approved scheme, with 6 MW refused. There are no applications currently awaiting a decision.
Other technologies in Flintshire
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.
Novarly Parcel · official public data, read properly · parcel.novarly.com