NR12 0PW — North Norfolk
Solar screening at 52.8249, 1.5319 · planning authority: North Norfolk
Screening verdict
A significant designation or a weak local approval record applies here — expect a harder case.
- North Norfolk has approved 100% of the 26 solar farms it has decided (UK-wide 93%).
- Median time to a decision there is 2.7 months (UK-wide 2.3).
- Listed building (THE HILL HOUSE THE HILL, HAPPISBURGH) — The point falls within a listed building; listed building consent is separate from planning.
- Conservation area (Happisburgh) — Character and appearance must be preserved or enhanced.
- Heritage at risk (Happisburgh) — A designated asset on the at-risk register; Historic England engagement is likely.
- Nutrient-neutrality catchment (Upper Thurne Broads and Marshes) — Nutrient budgets/mitigation may be required before consent.
- Agricultural land is Grade 1 — "best and most versatile", which weighs against ground-mounted solar and usually needs justification.
- Within 25 km, 10 comparable schemes were consented and 0 refused.
- Flood zone 3 (high probability) — the sequential and exception tests apply, and a flood risk assessment will be required.
- Surface-water flood likelihood is Very Low (Environment Agency NaFRA2) — rainfall flooding, which flood zones never show.
- Grid: 12 MW across 29 connections is already connected or accepted within 10 km, served mainly by Norwich — relatively light local use. This is competition for capacity, not a measure of what is available.
This authority's record
North Norfolk has decided 26 solar farms, approving 100%, with a median 2.7 months to a decision. Of 1 appeal, 1 was allowed. 3 applications awaiting decision.
Planning designations at this point
| Listed building THE HILL HOUSE THE HILL, HAPPISBURGH | The point falls within a listed building; listed building consent is separate from planning. |
| Conservation area Happisburgh | Character and appearance must be preserved or enhanced. |
| Heritage at risk Happisburgh | A designated asset on the at-risk register; Historic England engagement is likely. |
| Nutrient-neutrality catchment Upper Thurne Broads and Marshes | Nutrient budgets/mitigation may be required before consent. |
Policy says what should happen. This is what did: outcomes for solar farms decided inside each designation in England since 2018, against those decided outside it. Restricted to the current era on purpose — pooling every year mixes planning regimes, and for some designations the gap has moved a long way since.
- Of 44 solar farms decided since 2018 inside Conservation area in England, 84% were approved — 10 points lower than the 94% outside it.
- Of 114 solar farms decided since 2018 inside Nutrient-neutrality catchment in England, 91% were approved — about the same as the 94% outside it.
An association, not a cause. Sites are not randomly assigned to designations, the record gives one representative coordinate per scheme rather than a red-line boundary, and for solar this counts ground-mounted schemes only — rooftop behaves quite differently. Read it as the size of the hill, not a probability for your application.
What that land grade has cost others: 31 ground-mounted solar schemes on Grade 1 land in England reached a decision and 84% were approved, against 94% on Grade 3 land.
Agricultural land classification: Grade 1 — "best and most versatile" land, which weighs against ground-mounted solar.
Measured at a single point, from the national planning data platform. A site boundary may intersect designations this point misses — and landscape and cumulative impact, two of the most common real reasons for refusal, are professional judgements that no dataset contains.
Solar resource & yield
At the optimal 41° tilt facing due south, a fixed array here models 1055 kWh/kWp/year on the long-run average — so a 5 MWp scheme would generate roughly 5,275 MWh/year. Year-to-year variation is ±41.5 kWh/kWp, giving a P90 of 1001.8.
Modelled by PVGIS (PVGIS-SARAH3) with 17.8% total system losses, including real terrain shading. Indicative for feasibility — not a bankable energy yield assessment, which needs site-specific shading, soiling and layout modelling.
Flood & ground conditions
Zone 3 is the highest-probability designation for rivers and sea. The sequential test applies, the exception test may apply, and a site-specific flood risk assessment will be required — this is one of the most common reasons a development scheme fails.
Flood zones are the planning designation for rivers and sea only, ignoring defences; the likelihood bands include defences and add surface-water (rainfall) flooding, which zones never show. Measured at a single point — the official flood map draws the exact boundary.
Topography & earthworks
A steep plot — expect substantial earthworks or a split-level design, and get a survey before committing.
Levelling the whole 150 m × 150 m area to 19.41 m would move 12,445 m³ of cut and 21,028 m³ of fill — on the order of £203,407–£449,725 of earthworks at typical rates.
Read this as a worst case. It assumes levelling the entire area — most schemes level only a building platform, or use a split-level design or retaining walls instead, all of which move far less earth. Rates are indicative and exclude retaining structures, rock, contamination and disposal tax. From the Environment Agency 1 m LIDAR composite (22,500 ground points), which is bare-earth terrain — buildings and trees are already stripped out. A screening figure, not a substitute for a topographic survey and an engineer's design.
Grid connection context
Only 12 MW across 29 sites is connected or accepted within 10 km. Less local competition on record — but roughly 17% of register entries carry no coordinates, so this is a floor rather than a full count, and it never guarantees available capacity.
What is connected nearby: Solar 11 MW (17); Fossil - Gas 1 MW (1); Other 0 MW (1); Biofuel - Landfill gas 0 MW (1) · connecting at 11 kV.
Transmission queue at Norwich
Norwich Yare ASHGREEN ENERGYFARM LIMITED · Energy Storage System;PV Array (Photo Voltaic/solar) | 50 MW | Consents Approved |
Transmission-level projects contracted at the grid supply point serving this area, matched by substation name — indicative, since the two registers name nodes differently.
What this is not: available capacity. These registers show what is already connected or contracted, which tells you how contested the local network is — no open dataset publishes deliverable MW at a point. About 17% of register entries carry no coordinates, so the totals here are a floor. The grid supply point shown is the one serving the most connections nearby, which may not be the node that would serve this site. Confirm with a formal DNO connection enquiry before relying on any capacity assumption.
Comparable schemes within 25 km
| Scheme | Dist | MW | Outcome |
|---|---|---|---|
Paston Road, Bacton - Solar Photovoltaic Array Shell UK (Head Office) · North Norfolk · 12.7 mo to decide | 5.5 km | 1.6 | Awaiting Construction |
Carlton Farm Solar farm Private Developer · North Norfolk · 1.5 mo to decide | 9.3 km | 5 | Operational |
Bunn's Hill Solar Park Solar Century/ Bluefield Solar · North Norfolk · 3.7 mo to decide | 9.5 km | 5 | Operational |
Frog's Loke Solar Farm Frogs Loke Solar · North Norfolk · 3.7 mo to decide | 9.5 km | 5 | Operational |
Victory Swim and Fitness Centre, Station Road - Solar Panels Victory Swimming & Fitness Centre · North Norfolk · 1.9 mo to decide | 10.1 km | 0.24 | Awaiting Construction |
Laurels Farm, Laurels Road - Solar PV Array H A Overton & Sons Limited · North Norfolk · 3.9 mo to decide | 10.6 km | 0.24 | Awaiting Construction |
R And Jm Pace, Church Road - Solar Array R & J M Place Limited · North Norfolk · 3.8 mo to decide | 11.2 km | 1.08 | Awaiting Construction |
Wayside Farm Yge Warren House · North Norfolk · 3.3 mo to decide | 11.6 km | 5 | Awaiting Construction |
SCOTTOW ROAD SOLAR FARM Shaw Coltishall Solar Park Limited · North Norfolk | 13.9 km | 12.7 | Application Withdrawn |
Scottow Moor - RAF Coltishall Solar Farm (Phase 1) Greencoat Capital · North Norfolk · 2.5 mo to decide | 14.1 km | 32 | Operational |
Scottow Moor - RAF Coltishall Solar Farm (Phase 2) Greencoat Capital · North Norfolk · 2.5 mo to decide | 14.1 km | 17.9 | Operational |
Herbert Woods, Bridge Road - Solar Panels Herbert Woods · Great Yarmouth | 14.1 km | 0.18 | Application Withdrawn |
The nearest recorded schemes of this technology, whatever the outcome — refusals are the useful ones. About a quarter of REPD records are located only approximately, so distances are indicative.
Novarly Parcel · official public data, read properly · parcel.novarly.com
Sources: Renewable Energy Planning Database (DESNZ, OGL v3.0), extract 2026 Q1 — approval rate over decided applications only; planning designations and agricultural land classification via planning.data.gov.uk (MHCLG, OGL v3.0), measured at a single point; solar yield from PVGIS (European Commission JRC). This is a screening from public data — not planning advice, not a site survey, and not a bankable yield assessment. Landscape and cumulative impact are not modelled. Generated 2026-09-22.