Our daily checks of Mining Remediation Authority, recorded mine entries (06:21 UTC on 21 November) and OpenStreetMap building footprints (Overpass) (06:21 UTC on 21 November) failed. Those sources may show as "did not answer" here until they recover. See how we check.
Can I extend this house?
And what will the ground and the trees make me build?
A free verdict on your householder permitted-development rights, read from the designations at your point. Three limits up front: it is England only, it covers existing houses, not flats, and it cannot see rights removed by a planning condition on the original permission, because no national dataset records those.

- Under 2 h
- 2 to 4
- 4 to 6
- 6 to 8
- 8 or more
- Roofs and tree crowns
Limited rights
Bath conservation area and the City of Bath World Heritage Site at the point, in Flood Zone 1 (the lowest flood risk); medium shrink–swell ground with a tree inside its influence zone puts footings in the 2.0–2.5 m band, 57 % of the garden gets six hours of June sun against 3 % in December, and all 5 householder applications within 100 m in three years were approved.
Read the full sample report →What the report covers, and what each section costs
The verdict is free. The rest is sold by section: tick the ones you need, from £4 each, and pay their sum, never more than £19 for one address. Reach £19 and you get all five.
- VerdictConsent needed, limited rights, full rights, or cannot confirm — with the designation that decides it quoted.Free
- Constraints within 50 mProtected trees, listed buildings, flood zones and bands, nearby main rivers (the EA permit zone runs 8 m from the bank, 16 m if tidal), recorded mine entries, radon — each with what it changes for your build.£7
- Ground and foundationsBGS 1:50,000 geology at the point, the shrink–swell class, the nearest tall tree from LIDAR, and the NHBC foundation-depth band an engineer will start from.£8
- Party wallDistances to the neighbouring walls from OpenStreetMap footprints: within 3 m or 6 m triggers a Party Wall Act notice for foundations.£4
- Sun mapDirect sun hours on every square metre of the garden on 21 June, 20 March and 21 December, with the sunniest 2 m².£6
- Neighbours’ decisionsSmall-scale planning applications within 100 m in the last three years — up to the latest 50 — what was approved and what was refused.£4
One street, on the shortest day and the longest
This is 240 metres by 120 of Bathwick, around the sample address, drawn at its true height from the Environment Agency’s laser survey. The green is the Agency’s own model of tree crowns. The colours are hours of direct sun on the open ground, worked out by the sun-path code the report runs over one garden.
A line every 50 m. The figures along the edge are metres east and north within the kilometre square.
Ordnance Survey National Grid.
45.4 to 83.3 m above sea level, drawn at its true height.
Environment Agency LIDAR Composite first-return DSM, 1 m, averaged to 2 m cells. © Environment Agency copyright and/or database right 2022. All rights reserved. Contains public sector information licensed under the Open Government Licence v3.0. Fetched 11 November 2026.
- Trees and tall shrubs23.8%
Worked out from the Environment Agency LIDAR Vegetation Object Model (VOM), 1 m, and Ordnance Survey OS OpenMap - Local buildings. © Environment Agency copyright and/or database right 2022. All rights reserved. Contains Ordnance Survey data © Crown copyright and database right 2026. Worked out from their data. Contains public sector information licensed under the Open Government Licence v3.0. Fetched 11 November 2026.
Vegetation taller than 2.5 m. The Agency says the model is made automatically, with no checking or editing by hand other than visual checks. It also says some objects not on Ordnance Survey's maps could be classed wrongly. Shown where the surface also stands more than 2.5 m above the ground. Of what still stands blank, 94.1% lies on or within 2 m of a building on Ordnance Survey's map.
- Under 2 hours72.6%
- 2 to 4 hours15.8%
- 4 to 6 hours11%
- 6 to 8 hours0.6%
- 8 hours or more0%
Novarly sun-path model over the Environment Agency first-return surface: clear sky, direct sun only, 10-minute steps, read 1 m above the ground. © Environment Agency copyright and/or database right 2022. All rights reserved. Worked out from Environment Agency data. Contains public sector information licensed under the Open Government Licence v3.0. Fetched 11 November 2026.
Shares are of the open ground, 62.4% of the sheet. Anything standing more than 2.5 m above the ground gets no reading: crowns stay green and roofs stay blank. Shade from as far as 100 m outside the sheet is counted.
- Under 2 hours4.5%
- 2 to 4 hours5%
- 4 to 6 hours9.5%
- 6 to 8 hours12.4%
- 8 hours or more68.6%
Novarly sun-path model over the Environment Agency first-return surface: clear sky, direct sun only, 10-minute steps, read 1 m above the ground. © Environment Agency copyright and/or database right 2022. All rights reserved. Worked out from Environment Agency data. Contains public sector information licensed under the Open Government Licence v3.0. Fetched 11 November 2026.
Shares are of the open ground, 62.4% of the sheet. Anything standing more than 2.5 m above the ground gets no reading: crowns stay green and roofs stay blank. Shade from as far as 100 m outside the sheet is counted.
Questions
Do I have to buy the whole report?
No. The verdict is free, and the paid report is five sections you can buy separately: constraints within 50 m £7, ground and foundations £8, party wall £4, sun map £6, neighbours’ decisions £4. Tick the ones you want and you pay their sum, never more than £19 for one address: once your sections add up to £19 you get all five. You can add sections later from your report link, and the same £19 limit covers everything you have paid for that address. If the data source behind a section failed our daily check, that section cannot be ticked that day, and you can leave an address so we email you when it is back.
Can I extend my house without planning permission?
In England most houses have householder permitted-development rights: a single-storey rear extension up to 4 m (detached) or 3 m (other houses), or 8 m / 6 m under the larger-home prior-approval route, up to 4 m high, with eaves no more than 3 m within 2 m of a boundary and no more than half the curtilage covered. Those rights are cut back on Article 2(3) land (conservation areas, national parks, AONBs, World Heritage Sites) and removed by Article 4 directions; listed buildings need listed building consent for everything. Flats have no householder rights at all. The free check reads the designations at your point from planning.data.gov.uk and tells you which band you are in.
Why does the report say the council has not published its Article 4 directions?
Councils upload Article 4 directions to planning.data.gov.uk themselves and many have not. "Nothing found" from a council that has uploaded nothing is not an all-clear, so the report checks whether the council has published any Article 4 rows at all before giving a full-rights verdict. If it has not, the verdict is "cannot confirm" and the honest next step is the council’s own constraint map.
How deep will my extension foundations need to be?
An engineer decides, but the band is predictable from two things: how much the ground shrinks and swells (clay soils such as London Clay, Gault and Oxford Clay are high; sands, gravels and chalk are low) and how close a tall tree is. NHBC Chapter 4.2 turns those into a minimum depth from about 0.75 m on low-shrinkage ground with no trees to over 2.5 m on high-shrinkage clay with a mature tree within a fifth of its height. The report reads the BGS 1:50,000 geology at your point and measures the nearest tall tree from Environment Agency LIDAR to give you that band.
What does the sun map show?
Direct sun hours on each square metre of the garden on 21 June, 20 March and 21 December, computed by tracing the sun’s path across the day against the 1 m LIDAR surface model, which carries every roof, wall and tree crown around the house. It is clear-sky, direct sun only. Use it to decide where a rear extension would put the patio into shade, and where the sunniest corner is worth keeping.
Which houses can the report not cover?
The verdict uses planning.data.gov.uk, which covers England only; Wales, Scotland and Northern Ireland are shown as not covered rather than guessed. Flats and maisonettes have no householder rights. Some estates had rights removed by a condition on the original permission, which no national dataset records, so the council’s decision notice is the only check for that. Where the LIDAR composite has a gap, the tree and sun sections say so.
Sources: planning.data.gov.uk (OGL v3); BGS 1:50,000 geology and GeoSure (contains British Geological Survey materials © UKRI); Environment Agency 1 m LIDAR composites, flood zones and main rivers (OGL v3); Defra NaFRA2 bands; HM Land Registry INSPIRE index polygons (© Crown copyright); OpenStreetMap (ODbL); PlanIt; Mining Remediation Authority; UKHSA radon. Permitted development is a legal test — apply for a lawful development certificate before building under it. How we check.
Novarly Parcel · official public data, read properly · parcel.novarly.com